Project: SpiritOfMudsuck   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Pete Dailey   -  
Project:   Sonex - Xenos-B Motorglider   -   VIEW REPORTS
Total Hours:1506.3
Total Flight Time:
Total Expense:$75148.03
Start/Last Date:Jul 01, 2016 - No Finish Date
Engine:Aerovee 2.1 Turbo
Propeller:Sensenich
Panel:MGL Avionics Explorer iEFIS/ECB/RDAC
 
Friendly URL: https://eaabuilderslog.org?s=SpiritOfMudsuck

Home or Last Project Picture

Mar 30, 2019     Fit Turbocharger Intake - (0.5 hour) Category: Engine
Have struggled with fitting the 2" 45 deg silicone intake tube to the turboharger for some time. The area next to the starter is a very tight fit, with the starter mount in firm contact with the intake tube. Was able to get the intake distribution assembly to fit by starting with the silicone around the distribution assembly, putting the assembly under the engine mount cross tube, then working the turbocharger end.
George suggested loosening the starter to allow it to clear enough to push the silicone into place. The port-side distribution assembly to intake pipe connecting silicone tube must be pushed out of the way to permit loosening of the starter mounting bolts.
With the starter loose, the hose clamp could also be put into place, providing a vibration wear shield for the silicone tube.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.